I need to make plans to redevelop a Large hall. I have the full measured survey (with CAD) file of it including elevations and all the details.
The Height of the Floor to the Roof's Eaves (before the slope starts) is approx 10 meters. Therefore in the very tall height I need to insert a First and Second Floor (at approx 2.6 metres internal heights with about 0.4 meters for Beam/Joist).
The main section of the hall is 9 meters Wide and 23.8 meters in Length. There is proposal to insert three walls along the Width at Gaps of 4.5 meters, 5.8meters, and 7.5 meters. This is to keep each section to have an entrance door and a window. No New Entrances can be proposed on the main walls of the Hall as it is a Listed Building. In the last section that has a 6 meter length there is a wall through mid Width of 4.5 meters to distribute the space between the end units that have side entrances. (refer to the file "20251021_Proposed Breakup of Great Hall.pdf").
I have made a proposed Floor Plan for the Residence 1 (9mx5.8m). This has a Stairwell running straight up on the proposed new wall on the width, immediately to the left as one comes in the entrance. The floor plans for each floor drawn to measurements attached pdf (Refer to the file "Residence 1 (9 X 5.8) The Great Hall.pdf").
Each Residence unit needs to be designed with entrance area having a double ceiling height - to provide the light to the Ground Floor and provide a sense of architecture and brilliance (sympathetic to the Listed building).
Residence 2 needs to have the similar layout (with stairwell and landing being the same and the extra 1.7 meters of depth taken by the living areas, and rooms).
Residence 3 & 4 - Need to have the Stairwell again on the left of the entrances - against the end wall and going upwards similar to the earlier residences and each floor having a room and a bathroom. The Bathrooms on the center wall so that the rooms can have the windows.
The Residents fitness Center needs stairwell on the left as one enters. However, rather than a straight stairwell it needs to be U shaped stairwell with landings and provision of a lift (for DDA Compliance (Disability Discrimination Act). So understandably about 2 meters on the West elevation (left of the entrance) will be completely taken by stairwell and lift. The stairwell and lift needs to be Boxed for Fire Safety.
Need the drawings for proposed development.
(I have the CAD file / file with the ".dwg" extension provided by the measured detailed survey done earlier in the year).
Next.js Meta Tag Bug Fix Category: CSS, Frontend Development, HTML, JavaScript, JQuery / Prototype, Next.js, Node.js, Web Development Budget: ₹600 - ₹1500 INR
15-Jan-2026 23:00 GMT
Entri Data Untuk Analisis Lanjut Category: Data Analysis, Data Entry, Data Management, Data Processing, Data Visualization, Excel, Google Sheets, Web Search Budget: $2 - $8 USD
Comprehensive SEO Audit & Website Enhancement for Gift10US.com Category: Competitor Analysis, Content Writing, Conversion Rate Optimization, Keyword Research, Page Speed Optimization, SEO, Usability Testing, Web Design, Website Optimization, WooCommerce Budget: $30 - $250 USD
15-Jan-2026 22:56 GMT
Diseñador Social media Category: Adobe Creative Cloud, CapCut, Graphic Design, Logo Design, Photoshop, Social Media Management, Social Media Marketing, Video Editing Budget: $30 - $250 USD
15-Jan-2026 22:55 GMT
Custom Equestrian Shirt Design Category: Fashion Consulting, Fashion Design, Graphic Design, PHP, Product Design, Textile Design, User Experience Research, User Interface / IA, Web Design Budget: $250 - $750 CAD
15-Jan-2026 22:54 GMT
Manifestation AI Mobile Coach Category: AI Development, App Design, Graphic Design, Logo Design, Mobile App Development, Mobile Development, Personal Development, UI / User Interface, User Interface / IA, UX / User Experience Budget: $250 - $750 AUD
15-Jan-2026 22:53 GMT
Enhanced Pre-Employment Vetting Category: Compliance, Data Analysis, Data Protection, Documentation, Investigation, Legal Research, Local Job, Report Writing, Research Budget: $10 - $90 USD
French Site On-Page SEO Overhaul Category: Content Writing, Internet Marketing, Keyword Research, Link Building, Marketing, SEMrush, SEO, WordPress Budget: $250 - $750 USD
15-Jan-2026 22:51 GMT
Timber Outbuilding Load Verification Category: AutoCAD, Building Design, Building Regulations, CAD / CAM, Civil Engineering, Construction Engineering, Engineering Drawing, Structural Engineering Budget: £250 - £750 GBP