We are seeking a designer with strong experience in low-carbon building services to support a heat decarbonisation project. The building is a multi-storey healthcare facility in a town centre location. It currently operates with gas boilers and direct-fired water heaters, all of which are end-of-life.
The client’s objective is to significantly reduce fossil fuel use by introducing a cascade heat pump solution (air-source and water-source), supported by buffer vessels and integrated with existing distribution systems. Due to site constraints, full removal of gas is not feasible; therefore, a hybrid arrangement with retained boilers as backup is anticipated.
Key surveys and feasibility work have already been completed, including optioneering of suitable low-carbon options and confirmation of electrical capacity. The next step is to progress the project through the design stages, with a single designer retained across all phases.
Scope of Work
The commission is divided into three RIBA stage packages:
Stage 1–2: Preparation & Concept Design
Review feasibility outputs and schematic layouts provided.
Develop the preferred option into a concept design.
Confirm plant space planning (roof and plantroom constraints).
Identify any additional surveys or investigations required.
Stage 3–4: Developed & Technical Design
Produce developed designs, schematics, and schedules.
Coordinate with structural and electrical inputs (roof load checks, switchboard integration).
Address noise, planning, and operational considerations.
Provide detailed technical design suitable for tender.
Stage 5–6: Construction & Handover
Provide design support during installation, including responses to technical queries.
Attend progress meetings as required (remote acceptable).
Support commissioning, testing, and final sign-off.
Provide as-built information and O&M content.
Deliverables
Design drawings and schematics (CAD/Revit or agreed format).
Plant and equipment schedules.
Integration notes for BMS and controls.
Design risk assessments.
Supporting documentation for funding and compliance.
Requirements
Proven experience in low-carbon building services design, particularly cascade heat pump systems.
Ability to work to RIBA stages and produce clear technical deliverables.
Familiarity with healthcare or similarly complex building environments desirable.
Automated Excel Answer Column Category: Data Analysis, Data Processing, Data Visualization, Excel, Excel Macros, Excel VBA, Visual Basic, Visual Basic For Apps Budget: $30 - $250 AUD
02-Dec-2025 22:59 GMT
Buat Aplikasi Sosial Berbagi Foto Category: Flutter, IPhone, Kotlin, Mobile App Development, React Native, UI / User Interface, Video Editing, Video Services Budget: $15 - $25 USD
Pixar-Style Kids Educational AI-Generated Videos Category: After Effects, AI Animation, AI Art Creation, AI Content Creation, AI Generated Video, Animation, Video Editing, Video Services, Voice Over Budget: $250 - $750 USD
Android "Roulette Royale" app Clone Category: Android App Development, Game Design, Game Development, Game UI, Java, Kotlin, Mobile App Development, Mobile Development, Unity, Unity 3D Budget: $750 - $1500 USD
02-Dec-2025 22:48 GMT
تصميم شعار ومتجر إلكتروني Category: Adobe Illustrator, Photoshop, Content Management System (CMS), Graphic Design, Logo Design, Payment Gateway Integration, Web Development, Web Design Budget: $10 - $50 USD
02-Dec-2025 22:47 GMT
Diseño ergonómico instrumento musical electrónico Category: 3D Modelling, Corporate Identity, Graphic Design, Industrial Design, Logo Design, Marketing, Photoshop, Product Design, User Ergonomics, User Experience Research Budget: $10 - $30 USD