We are seeking a designer with strong experience in low-carbon building services to support a heat decarbonisation project. The building is a multi-storey healthcare facility in a town centre location. It currently operates with gas boilers and direct-fired water heaters, all of which are end-of-life.
The client’s objective is to significantly reduce fossil fuel use by introducing a cascade heat pump solution (air-source and water-source), supported by buffer vessels and integrated with existing distribution systems. Due to site constraints, full removal of gas is not feasible; therefore, a hybrid arrangement with retained boilers as backup is anticipated.
Key surveys and feasibility work have already been completed, including optioneering of suitable low-carbon options and confirmation of electrical capacity. The next step is to progress the project through the design stages, with a single designer retained across all phases.
Scope of Work
The commission is divided into three RIBA stage packages:
Stage 1–2: Preparation & Concept Design
Review feasibility outputs and schematic layouts provided.
Develop the preferred option into a concept design.
Confirm plant space planning (roof and plantroom constraints).
Identify any additional surveys or investigations required.
Stage 3–4: Developed & Technical Design
Produce developed designs, schematics, and schedules.
Coordinate with structural and electrical inputs (roof load checks, switchboard integration).
Address noise, planning, and operational considerations.
Provide detailed technical design suitable for tender.
Stage 5–6: Construction & Handover
Provide design support during installation, including responses to technical queries.
Attend progress meetings as required (remote acceptable).
Support commissioning, testing, and final sign-off.
Provide as-built information and O&M content.
Deliverables
Design drawings and schematics (CAD/Revit or agreed format).
Plant and equipment schedules.
Integration notes for BMS and controls.
Design risk assessments.
Supporting documentation for funding and compliance.
Requirements
Proven experience in low-carbon building services design, particularly cascade heat pump systems.
Ability to work to RIBA stages and produce clear technical deliverables.
Familiarity with healthcare or similarly complex building environments desirable.
Military Medical Readiness Tracker Category: Algorithm, Data Analysis, Data Integration, Data Management, Data Processing, Data Visualization, Database Management, Software Development Budget: $250 - $750 USD
13-Mar-2026 22:52 GMT
Integrate Services with SSL Security Category: API, Cloudflare, JavaScript, Network Security, SSL, Web Development, Web Security, Windows Server Budget: $25 - $50 AUD
13-Mar-2026 22:51 GMT
Python Web Scraper — Florida Court Data Category: Data Scraping, Pandas, Python, Scrapy, Selenium Webdriver, Software Architecture, Web Scraping Budget: $30 - $250 USD
13-Mar-2026 22:51 GMT
B2C Callback Landing Page Category: Analytics, Conversion Rate Optimization, CSS, HTML, PHP, Web Design, Web Development Budget: $30 - $250 USD
Cross-Platform Mobile App Build Category: AI Development, Android, Android App Development, Flutter, IOS Development, IPhone, Mobile App Development, PhoneGap Budget: min $50 USD
13-Mar-2026 22:44 GMT
Affiliate Marketers for SaaS Growth Category: Affiliate Marketing, B2B Marketing, Content Marketing, Facebook Marketing, Google Analytics, Instagram Marketing, Internet Marketing, Sales Budget: $750 - $1500 USD
13-Mar-2026 22:43 GMT
Comprehensive Web Platform Validation & QA Category: API Testing, Regression Testing, Software Architecture, Software Testing, Test Automation, Test Plan Writing, Testing / QA, Web Testing Budget: $30 - $150 USD
13-Mar-2026 22:43 GMT
Google Workspace Configuration Category: DNS, Email Handling, Google Systems, Helpdesk, System Administration, Technical Support Budget: ₹1500 - ₹12500 INR