We are installing external wall insulation to a property
We have submitted plans and have been asked to
Only drawn plans will be acceptable these can then be annotated. Plans denoting the adjustments to the external wall insulation which was discussed with Gwynedd Highways will also be required. Then a typical cross section plan will be required which will demonstrate the thickness of the insulation to be added onto the existing wall, along with the finish.
If I supply the pictures of the elevations with the measurements on, I need the drawings to meet the above requirements
Required pull database clients website electronic internal Category: Data Analysis, Data Collection, Data Entry, Data Extraction, Data Management, Data Mining, Data Processing, Database Management, Excel, Web Scraping Budget: $30 - $250 USD
17-Sep-2025 15:57 GMT
Generative AI Assignment Category: AI Chatbot, AI Chatbot Development, AI Development, C, Programming, Java, Natural Language Processing, OpenAI, PDF, PHP, Software Architecture Budget: ₹600 - ₹1500 INR
17-Sep-2025 15:57 GMT
Odoo v17 RFID Integration Category: Android, API Development, Asset Management, Bluetooth Low Energy (BLE), Inventory Management, Mobile App Development, Odoo, Python, REST API, Software Documentation Budget: $250 - $750 USD