I have recently had a first floor rear extension completed and the building regulator has requested the following:
• A copy of the structural engineers drawings and calculations are required, the engineer's accreditation details should be on the head of each page. • Clarification is required on the insulation build-up to the roof and walls, a confirmation of the achieved u-value is required. • Confirmation required whether the roof is a warm or cold deck roof design.
I already have the drawings and calculations from a structural engineer I used but his accreditation details are missing.
AI Pest Identifier App Development Category: AI Consulting, AI Development, AI Model Development, Android, Image Processing, Image Recognition, IOS Development, IPhone, Mobile App Development, PHP Budget: $250 - $750 CAD
Edit 2 Minute Tutor Intro Category: A / V Editing, After Effects, Animation, Audio Editing, Education & Tutoring, Video Editing, Video Post Editing, Video Production Budget: ₹600 - ₹900 INR
20-Feb-2026 04:51 GMT
WordPress Speed & SEO Tune-Up Category: Elementor, Google PageSpeed Insights, PHP, SEO, Web Development, Website Optimization, WordPress Budget: $250 - $750 AUD