The description of the project is as follows: "Power BI Azure Map Flood risk europe, I want to create a power bi project with an azure map layer that shows me the flood risk per area in whole europe. Light orange for low risk, dark orange for higer risk. No color for no risk."
B2B Social Media Interview Prep - Case Prep and Mock Interview Category: B2B Marketing, Competitor Analysis, Content Strategy, Digital Marketing, Linkedin, Market Research, Marketing, Marketing Strategy, Research Writing, Social Media Marketing Budget: $25 - $50 USD
19-Nov-2025 23:00 GMT
Remote Architectural CAD Technician Required Category: 2D Drafting, Architectural Engineering, Architecture, AutoCAD, Building Architecture, Building Regulations, CAD / CAM, Home Design Budget: £20 - £250 GBP
Dynamic Award Intro Animation Category: 3D Animation, After Effects, Animation, Graphic Design, Motion Design, Video Production, Video Services, Visual Effects Budget: ₹600 - ₹1500 INR