Expected duration: 1 day or less I need a boq and cost estimate for a structural project, just the concrete foundation broken down In an excel sheet and also like the form attached
1. Excavation of footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 2. Excavation of exterior and interior grade beams – Ref. S100 details 1,2,3,4,5,6,7 & 8/S300 3. Installation of vapor barriers for footings, grade beams and slab on grade concrete 4. Footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 5. Exterior and interior grade beams – Ref. foundation size schedule for conventional grade beams and footings on S100 and details 1,2,3,4,5,6,7 & 8/S300 6. Structural Steel anchor bolts/ embed plate per 9/S300, baseplate per 10/S300 and A211 – Floor Plan Building B&C 7. Slab of grade reinforcement with #3@12” O.C. 8. Pour 4,000psi concrete footings, beams and slab on grade.
Word Doc Data Entry Category: Data Entry, Data Processing, Excel, Google Sheets, Microsoft Office, Transcription, Typing, Word Budget: ₹750 - ₹1250 INR
13-Oct-2025 09:59 GMT
Administrative Virtual Assistant Needed Category: Admin Support, Data Entry, Data Management, Excel, Management, Microsoft Office, Organization Design, Organizational Change Management, Risk Management, Time Management Budget: $250 - $750 USD
13-Oct-2025 09:54 GMT
Comprehensive Technical SEO Overhaul Category: Analytics, Competitor Analysis, Google Analytics, Internet Marketing, Link Building, PHP, SEO, WooCommerce, WordPress Budget: $30 - $250 AUD
13-Oct-2025 09:51 GMT
Realistic AI Video Production Category: After Effects, AI Animation, AI Art Creation, AI Chatbot Development, AI Content Creation, Video Editing, Video Production, Video Services Budget: ₹600 - ₹1500 INR